Day One of the Remodel

You can click on a picture to enlarge it.  It can take a few moments to load each one. 

Talk about taking something out of the Library!

The wall in the Narthex has been removed, as has the wall between the coatroom and a classroom.

The Choir space has been jackhammered up.

The Choir and organ will be moved to a space beside the Altar. A center doorway will be installed and the two side doorways will be removed.

I hope we don't get blamed for this!

A view from the old hallway looking toward the Altar.

A partially demolished wall

A hammer hangs in the wallboard of the old Library. To the left, the word REMOVE tells you what will happen tomorrow.

We're gonna need a bigger vacuum!

Proof the Bobcat has been working hard.

Day Two of the Remodel

All the walls are gone.

This view is from the Narthex looking toward the Altar. Heating pipes and electrical wires wait for their new walls to be put up.

The Organ Pit and the Choir Space

The concrete has mostly been removed, leaving the organ pipe pit exposed.

Center Entrance

Existing supports frame the location of the new center entrance.

The Bobcat in the Narthex

It looks like it's waiting to get back to work!

Photos are copyrighted and used with permission.